We developed a non-combustible construction design using CMU walls with light gauge metal roof trusses, creating a durable and low-maintenance structure. The client decided to add this project to an existing project already underway, requiring our team to design and produce construction documents within an extremely tight four-week timeframe. We rose to this challenge, leveraging our well-established processes and seamless team collaboration to deliver high-quality plans on schedule.